5/7/26

Nevada Test Site seismicity from January 22 to January 26, 2026 recovered using waveform cross correlation

 This post follows teh same structure as the previous few on the Nevada Test Site seismic activity. Five  days are presented. Figure below shows locations of 25 events found by waveform cross correlation. Catalog is below.



Figure. Locations of master events (red) and the events found by cross correlation (yellow). The NST center is shown by black circle.




No comments:

Post a Comment

Nevada Test Site seismicity from January 22 to January 26, 2026 recovered using waveform cross correlation

 This post follows teh same structure as the previous few on the Nevada Test Site seismic activity. Five  days are presented. Figure below s...